Maritime Reader

NEWS INTELLIGENCE ARCHIVE
03 AUG 2026 MONDAY
Advanced filters
Keywords | type to search… Date: All time Sources: All Topics: All
ADVISORIES ARE AVAILABLE AT http://www.pancanal.com FOR ETAS OR DIRECT COMMUNICATION WITH OUR OFFICES, REFER TO NOTICE N-3-2020 Panama Canal Authority Vice Presidency for Operations Advisory to Shipping No. A-17-2023 April 13, 2023 TO : All Shipping Agents, Owners, and Operators SUBJECT: Draft Adjustment in the Neopanamax Locks Despite the ACP’s continuous efforts to minimize draft restrictions by implementing water-saving measures in the transit operation, the level of Gatun Lake has been falling faster than originally predicted. The precipitation in the Canal watershed for the first 11 days of April is approximately 70% below the historical average, and the water supplied by the rivers to the Canal’s watershed is 80% below average. Due to the current situation, the ACP finds it necessary to update the maximum drafts already announced in Advisories to Shipping A-14-2023 and A-16-2023. Thus, effective April 19, 2023, the maximum authorized draft for vessels transiting the Neopanamax locks will be 14.48 m (47.5 feet) TFW, and effective April 27, 2023, the maximum authorized draft will be 14.33 m (47.0 feet) TFW. In addition, effective May 5, 2023, the maximum authorized draft will be 14.17 m (46.5 feet) TFW, and effective May 12, 2023, the maximum authorized draft will be 14.02 m (46.0 feet) TFW. The maximum authorized drafts for the following weeks are summarized in the following table: DATE MAXIMUM AUTHORIZED DRAFT (TFW) April 19, 2023 14.48 m (47.5 feet) April 27, 2023 14.33 m (47.0 feet) May 5, 2023 14.17 m (46.5 feet) May 12, 2023 14.02 m (46.0 feet) Vessels must comply with the maximum authorized draft at the time of transit. Since the waiting time varies from vessel to vessel depending on several factors, including booking status, Canal conditions, and number of vessels awaiting transit, it is possible that a vessel arrives in compliance with the maximum allowable draft, but a draft reduction becomes effective while the vessel is still awaiting transit. Therefore, the waiting time should be taken into consideration by vessels that intend to transit at or close to the maximum authorized draft at the time of arrival. The ACP will continue to monitor the level of Gatun Lake and announce future draft adjustments in a timely manner. ORIGINAL SIGNED Boris Moreno Vásquez Vice President for Operations 3654-A (OP-I) V. 1/10/2020
← Back to latest
news Panama Canal Authority ·2023-04-13

May 4, 2007

Panama Canal Authority
Read full article at Panama Canal Authority →
Opens Panama Canal Authority in a new tab

Topics & segments

← Back to latest

Related Knowledge

Documents on the same topic from the archive