Maritime Reader

NEWS INTELLIGENCE ARCHIVE
03 AUG 2026 MONDAY
Advanced filters
Keywords | type to search… Date: All time Sources: All Topics: All
Search for ships currently entered in the London P&I Club by their name or I M O number Search Search for correspondents in our global network by country/area or port/city Search Update: risk of liquefaction of Indian iron ore fines 29 August 2008 James Mackintosh & Co Pvt Ltd, P&I correspondents in India, have reported this week that they are currently involved in four disputes over the safety of wet iron ore fines cargoes offered for loading during the 2008 monsoon season, which they report is expected to run until October.   StopLoss 48 contained a warning about the severe stability problems experienced by bulk carriers which had loaded wet iron ore fines in various Indian ports, including Haldia, Vizakhapatnam and Mangalore. Liquefaction of the wet cargo reportedly led to two ships being beached to avoid capsize and at least one other bulker developed a dangerous list within days of departure from the load port. Shippers of cargoes which may liquefy are required by the Code of Safe Practice for Solid Bulk Cargoes to provide the Master with a certificate of the transportable moisture limit (TML) and the actual moisture content. Of course, the cargo should not be carried if the moisture content exceeds the TML. However, previous cases have shown that some shippers were unable to produce the necessary document or appeared to be offering certificates containing inaccurate and misleading information, particularly on the moisture content. As none of the stockpiles of iron ore fines in Indian ports are covered, the moisture content can vary considerably subject to the local weather conditions. The majority of the problems experienced last year were associated with sustained heavy rain during the monsoon. James Mackintosh & Co Pvt Ltds reminder emphasises that Members considering loading iron ore fines from any Indian port should insist upon the production of the appropriate certificate before loading begins but should also treat with caution any ce
← Back to latest
pi_circular London P&I Club ·2008-08-28

Update: risk of liquefaction of Indian iron ore fines

London P&I Club
Read full article at London P&I Club →
Opens London P&I Club in a new tab

Topics & segments

← Back to latest

Related Knowledge

Documents on the same topic from the archive