news Offshore Offshore Energy
Fit-out works are currently underway on the converter stations in Germany and the UK for NeuConnect, a high-voltage submarine cable that will create the first direct energy transmission link between the two countries. The construction of the 24-meter-high, 70-meter-wide converter hall buildings reac
Fit-out of NeuConnect’s converter stations in progress
Offshore Energy
Read full article at Offshore Energy →
Opens Offshore Energy in a new tab