Maritime Reader

NEWS INTELLIGENCE ARCHIVE
03 AUG 2026 MONDAY
Advanced filters
Keywords | type to search… Date: All time Sources: All Topics: All
The world’s dominant gas containment system provider for the LNG shipping industry is ready to start selling a new kit. France’s GTT has got all the necessary approvals for its NEXT1 LNG cargo containment system, officially sealed at this week’s Posidonia event in Athens, and the technology is now ready for commercial deployment. GTT NEXT1 technology aims to offer a thermal level of performance equivalent to that of its Mark III Flex+ technology while using two metallic barriers. The use of prefabricated reinforced polyurethane foam panels to support the two membranes provides what GTT believes is the best compromise between thermal and mechanical performance. The secondary barrier is made of Invar, and the design of the first barrier is based on the existing corrugated stainless steel concept, similar to that of the Mark technologies. Philippe Berterottière, chairman and CEO of GTT, stated: “We are proud to present this cutting-edge solution, which combines the best of our proven technologies with new advancements, ensuring optimal performance and improved reliability for the transportation of liquefied natural gas.” googletag.cmd.push(function() { googletag.display('div-gpt-ad-1_95_0_1_2'); }); TagsFrance Posidonia
← Back to latest
news Splash247 ·2024-06-07

GTT readies to start selling new gas containment system

Splash247
Read full article at Splash247 →
Opens Splash247 in a new tab

Topics & segments

← Back to latest

Related Knowledge

Documents on the same topic from the archive