news Offshore Offshore Energy
A consortium of Boskalis and Orient Cable (NBOS) has completed the pull-in and burial of the second export cable for TenneT’s Hollandse Kust West Beta offshore grid connection at the landfall location in Velsen-Noord, the Netherlands. The 700 MW grid connection will link the offshore wind farm that RWE will build in the Dutch North […]
TenneT NBOS Velsen-Noord OranjeWind Orient Cable Dutch North Sea Business Developments Hollandse Kust West Boskalis Netherlands BSSIII Wijk Using Egmond LiDAR
Export cables for RWE’s Dutch offshore wind farm installed at landfall point
Offshore Energy
Read full article at Offshore Energy →
Opens Offshore Energy in a new tab