news Offshore Offshore Energy
Following a pause due to poor weather and vessel maintenance, offshore cable operations have resumed at the Greenlink interconnector that will link Ireland and Wales. Cable burial and trenching activities are ongoing along the interconnector route by the 127-meter-long DP2 offshore support vessel Grand Canyon III, following the offshore cable installation with the cable lay vessel […]
Grand Canyon Greenlink Freshwater West Baginbun Beach Simon Stevin Helix Robotics Solution Following Connector Pembroke Wexford System
Offshore cable ops resume at Ireland-Wales interconnector after a break
Offshore Energy
Read full article at Offshore Energy →
Opens Offshore Energy in a new tab