news Offshore Offshore Energy
The first interconnector between Italy and Malta has returned to operation after it was shut down due to work on the second interconnector that will connect the two countries. As announced on March 28, the scheduled intervention required the temporary suspension of IC1 to allow for the safe rerouting of control cables in preparation for […]
Sicily Ragusa Terminal Station Next Geosolutions Offshore Energy InterConnect Nexans HVAC Terna Enemalta Maghtab Following NextGeo Take Join ADVERTISE
First Malta-Italy interconnector back in service after works on second link demanded shutdown
Offshore Energy
Read full article at Offshore Energy →
Opens Offshore Energy in a new tab