news Offshore Offshore Energy
Following the implementation of a multi-phase revised field development plan (FDP), a 27-year-old floating production, storage, and offloading (FPSO) vessel has enabled the restart of hydrocarbon production at an oil project off the coast of India, which was offline since July 2011.
India ONGC Hardy Exploration Invenire Petrodyne Svetah Venetia Phase Cauvery Basin Natural Gas Corporation Petrojarl Varg Manish Maheshwari Chairman of Invenire Energy Arunangshu Sarkar Director of Strategy Corporate Affairs Ministry of Petroleum
14-year production hiatus ends as oil flows into 1998-built FPSO
Offshore Energy
Read full article at Offshore Energy →
Opens Offshore Energy in a new tab