Maritime Reader

NEWS INTELLIGENCE ARCHIVE
03 AUG 2026 MONDAY
Advanced filters
Keywords | type to search… Date: All time Sources: All Topics: All
Members are asked to take note of the draft restrictions under different tidal conditions, and Masters are recommended to always check with local Agents prior to entry into a port whether the vessel's arrival draft does not exceed (a) any local restrictions and / or (b) will be a problem given the actual physical position of the port's maximum draft capacity. If a vessel exceeds the maximum allowed / physically available draft, then entry may not be safe. This can have both contractual consequences, as well as practical delay and cost. Entering while the vessel exceeds the maximum available draft is not prudent and could lead to a grounding or other casualty situation. Groundings are presently one of the most frequent casualty type case experienced and can quickly lead to very significant claims and practical salvage challenges, especially when they occur at high tides. When in doubt, Members and Masters should not hesitate to contact the Association and local Correspondents for assistance. If Members have any queries, they are asked to contact the Association. The Association is greatful to Correspondents Budd for sharing a translation of a recent circular issued by the Port of Dakar. Disclaimer The above article has been produced by or in co-operation with correspondents or other external sources and is reproduced here with their kind permission for general information purposes only. Reference is made to the Legal disclaimer governing use of this website.
← Back to latest
pi_circular Skuld ·2013-04-15

Dakar: Draft restrictions

Skuld
Read full article at Skuld →
Opens Skuld in a new tab

Topics & segments

← Back to latest

Related Knowledge

Documents on the same topic from the archive